top of page

Herrenknecht Tunnelling Systems

CONTEXT

The project required documenting the intricate tunnel-boring process and the immense scale of the machinery involved. Herrenknecht’s advanced Tunnel Boring Machines played a pivotal role in this ambitious expansion, and capturing their operation was essential to showcasing the
technological innovation and engineering excellence at the heart of the project.

APPROACH

Kyle LaFerriere navigated the complexities of working near strategic locations, including military installations. Coordinating closely with the US Navy, he secured the necessary drone permits to operate in restricted airspace, ensuring full compliance with safety and security protocols.

The photoshoots utilized a blend of ground and aerial photography to depict the full scope of the construction efforts. From the precision engineering of the Tunnel Boring Machines to the monumental work of the construction teams, the imagery captured every aspect of this impressive project.

RESULTS

The resulting visuals have been integral to Herrenknecht’s marketing materials, industry presentations, and project documentation. These images effectively communicate the scale, innovation, and significance of the project, elevating the brand’s presence in the construction and engineering sectors.

at a glance

Role -- Stills

Days – 5

Locations -- 1

Client crew – 4

Talent – 10+

Laughs at Kyle's new boots -- 3

LOCATION

GALLERY

have a project?
give me a call

Related case studies

bottom of page